CAIRNGORMS NATIONAL PARK AUTHORITY

Title: 			REPORT ON CALLED-IN PLANNING
			APPLICATION
Prepared by: 		MARY GRIER, PLANNING OFFICER
			(DEVELOPMENT MANAGEMENT)
			DEVELOPMENT PROPOSED: PLANNING PERMISSION FOR THE
			FORMATION OF A WALK /
			CYCLEWAY; THE FORMATION OF
			PASSING PLACES AND ADDITIONAL
			CAR PARKING AT BADAGUISH
			OUTDOOR CENTRE, GLENMORE.
REFERENCE: 		09/295/CP
APPLICANT: 		SPEYSIDE TRUST BADAGUISH
			OUTDOOR CENTRE C/O BRACEWELL
			STIRLING ARCHITECTS, INVERNESS
DATE CALLED-IN: 	2 OCTOBER 2009
RECOMMENDATION: 	APPROVE, WITH CONDITIONS

NOTE: The section below is made up of or includes images which cannot be 
converted to text. Please see original PDF for reference. 

Fig. 1 - Location Plan

SITE DESCRIPTION AND PROPOSAL

1. Planning permission is sought in this application for the formation of a walk /
cycleway, the formation of passing places and an additional car parking area at
Badaguish Outdoor Centre in Glenmore. The outdoor centre is operated by
Speyside Trust and currently includes a variety of indoor and outdoor activity
areas, as well as accommodation facilities. The core area of the outdoor centre
is located in a clearing in Glenmore Forest, and is accessed via a single track
access road which extends from the nearest public road (which leads from
Aviemore to Glenmore and the Cairngorm Mountain ski centre). The Old
Logging Way i.e. the recently developed Aviemore Ð Glenmore off road cycle
route, terminates at the junction of the Badaguish access road and the public
road. At present users of the route exit onto the access road serving Badaguish,
with the majority continuing their journey along the single width access road and
re-joining the forest track approximately 350 metres to the north-east.

2. The walk / cycleway which is the subject of this application would be
approximately 1,600 metres in length and is proposed to run adjacent to the
western side of the access road, from its junction with the public road to the
main area of the Badaguish complex. For the most part the line of the path is
proposed to be constructed along the line of an existing ditch. The applicants
consider that the construction of the route is desirable for safety reasons, as the
existing arrangement Òhas become a safety concern due to accidents resulting
from increased use of the access track by cyclists since the opening of the
Aviemore to Glenmore off road cycle track.Ó The proposed new walk /
cycleway would allow the separation of walkers /cyclists/other non motorised
users from vehicles which use the existing Badaguish access road.

NOTE: The section below is made up of or includes images which cannot be 
converted to text. Please see original PDF for reference. 

Fig. 2: Proposed route along the line of the ditch, adjacent to the existing single
track access road.

3. Three passing places are proposed, all of which would be positioned on the
eastern side of the existing access road. The first of the passing places is
proposed approximately 250 metres from the junction with the public road, the
second is approximately 450 metres from this, and the final passing place is
proposed approximately 70 metres from the main area of the Badaguish
complex.

4. The final element of the development proposal is the formation of an additional
car parking area within the Badaguish complex. The overall site area identified
for car parking extends to approximately 3,600 square metres (0.35 hectares)
and is proposed on the eastern edge of the complex in an area which currently
accommodates a spruce plantation. The identified site area is dissected by the
Allt Feithe Moire burn which runs through it. The site layout plan shows car
parking curtailed to the southern side of the burn, with provision being made for
52 formal car parking bays, arranged in a V shape. Supporting information
indicates that a 5-10 metre exclusion zone would be established along the burn
adjacent to the car park and that this would be Òenhanced by new native tree
planting to create an attractive wildlife and landscape feature to provide
screening and amenity to the car park.Ó

NOTE: The section below is made up of or includes images which cannot be 
converted to text. Please see original PDF for reference. 

Fig. 3: Proposed car parking arrangement

Construction details
5. The proposed walk / cycleway would be 2 metres wide. Excavation and scraping
work would be undertaken in order to remove any organic matter. The path
would then be constructed with up to 900 mm depth of clean crusher run and
would be surfaced with a 25mm layer of quarry dust.1 Supporting information
indicates that the finished path is intended to be as Òunobtrusive as possible and
fit comfortably into the terrain it crosses with a minimum of impact and
disturbance to the surroundings with no visible bare ground or spoil.Ó
Machinery involved in the proposed path construction would include excavators
of up to 7 tonnes in size, tracked dumpers of up to 3 tonnes in size, a twin
drummed vibrating roller and a standard range of hand tools.

6. The route of the proposed walk / cycleway would cross a burn at two points. It
is proposed to install culvert pipes to channel the water under the path. The
culvert pipes would be 300mm in diameter and would be twin walled
polypropylene perforated. At certain points along the route a turf lined ditch
would be developed in order to collect water and direct it away from the new
path. The ditch would be formed by excavations to a depth of 500 mm, to
create a low profile. The ditch would be approximately 1,200mm wide. It
would be re-vegetated with blanket turf in order to provide the final finished
profile.

1 The maximum particle size in the quarry dust would be 5mm, which would be compacted to form a
1:35 centre camber / cross fall, with a consistent even surface regularity with no high points and no hollows.

7. The proposed new car parking area would be created by clear felling the
necessary extent of spruce plantation on the site, following by some excavation
work and the importation of sub-base material. Surface dressing would be
25mm compacted quarry dust. The perimeter of the car parking area would be
edged with half logs. It is also proposed that the half logs would be used to
delineate individual car parking bays. The most recently submitted site layout
plan also identifies areas of planting within the proposed car parking area. The
details provided indicate that Ònew landscaping in these areas shall be planted
with native trees and shrubs of local provenance to enhance biodiversity.Ó
Car parking need

8. In the course of the CNPA assessment of the planning application the need for
the proposed car parking area was queried. In a response submitted on behalf
of the applicants reference has been made to it being an agreed aim with
Highland Council Education Department that on site safety would be improved
by making efforts to centralise parking facilities and to limit cross site vehicle
movements and therefore minimise potential conflicts with pedestrians. The
proposed new car parking area has been designed to accommodate varying
levels of car parking demand generated by the variety of facilities and
accommodation that exists on site at present, as well as occasional events run at
the site. It is intended that visitors to the Badaguish facility would park their
vehicles in this proposed new main car park and that vehicular access through
the rest of the complex would be curtailed to necessary circumstances, for
example in an emergency or accessing specific buildings upon arrival or
departure.

NOTE: The section below is made up of or includes images which cannot be 
converted to text. Please see original PDF for reference. 

Fig. 4: Arrow indicates proposed new car parking area

9. Reference is also made in the supporting information to the proposed new car
parking area being of benefit in easing parking pressures for special events which
tend to generate increases in the numbers of day visitors. The Schools Outdoor
Challenge is cited as an example, as it involves the participation of 15 schools
and in the region of 300 Ð 400 young people attending. The proposed new car
parking area is described as Òvaluable in itself for the safety and efficient
functioning of the site.Ó

Ecological Considerations
10. An Ecological Survey and Impact Assessment2 has been submitted in support of
the planning application. It is acknowledged at the start of the document that
the development site lies within the Cairngorms National Park, and that part of
the site is also within areas designated for conservation, namely the Cairngorms
Special Area of Conservation (SAC), Cairngorms Special Protection Area (SPA)
and it is also within the Glenmore Forest Site of Special Scientific Interest (SSSI).
Various studies were conducted, concerning protected species, red squirrel,
wood ants and birds.

11. A protected species survey considered the aquatic features of the site, which is
essentially the ditch over which the walk /cycleway would be constructed; and
also a burn which flows through the proposed car parking site. The aquatic
features in the survey area were considered unsuitable for otters, water voles or
great crested newts. The potential presence of badgers was also considered.
No signs of badgers were found during the walkover survey and the assessment
findings consider it unlikely that badgers are utilising the proposed development
area. It is also noted in the assessment that pine martens are known to be
present in the local area. Although there was no sign (usually in the form of
droppings), during the walkover survey, it is stated that Òtheir presence should
be treated as possible.Ó Finally bats were discussed under the banner of
Protected Species and it was noted that the open area of woodland and the
woodland edges of the Badaguish Centre, including the proposed car parking
area provide some suitable foraging habitat for Vespertilionid bats. Despite this
however, the assessment states that Òthe small number of trees to be felled in
the car park development are Sitka spruce and this species does not regularly
develop the complex growth form that provides crevices and holes for bat
roosts.Ó

12. A red squirrel survey was carried out in June 2009 and a potential disturbance
buffer zone of 40 metres either side of the proposed walk / cycleway was
surveyed. One drey was found approximately 35 metres from the proposed
works, located close to the archery area in the south of the Badaguish complex.
The drey was given a 5 rating, which indicates that it is a Ômost likelyÕ case3 that
it is active. However no trees are to be felled in this part of the development.

13. The third survey undertaken was for wood ants. It is noted in the ecological
assessment that the Glenmore-Rothiemurchus-Aviemore forest complex is a
stronghold of several species of wood ants. However, no wood ant nests were
found in the proposed development areas. One wood ant nest was identified at
the side of the access road, close to the originally proposed position of lay-by 3.4
It is recommended in the ecological assessment that if the nest remains in place
2 The Ecological Surveys and Impact Assessment was carried out by Aquaterra Ecology on behalf of
the Speyside Trust. The information was submitted in September 2009, with a revised assessment
submitted in December 2009.
3 Dreys which are considered Ô most likelyÕ to be active display signs such as being well formed, with recent signs of fresh building and bedding material, and / or an entrance hole.
4 A number of the lay bys were originally proposed on the western side of the access road, adjacent to the proposed walk / cycleway. The proposed location of the lay bys was amended (to the east of the access road) on the site layout plan received in January 2010.
at the time of the works that it should be clearly marked and identified to the
construction crew.

14. The final survey detailed in the ecological assessment relates to birds. The
woods of the Glenmore-Rothiemurchus-Abernethy forest complex are noted as
being important for a number of species of birds of conservation concern
including Scottish crossbill, capercallie and the crested tit. The ecology
assessment quotes Tim Poole, Capercallie Project Officer having advised that
Òthe new footpath / cycleway parallel to the main access track will have a
negligible impact on capercallie.Ó In addition as the construction work would
not involve any tree removal it is also considered unlikely to impact on crested
tits or Scottish crossbill. The assessment does however highlight the concerns
expressed by Tim Poole that Òthe presence of the new cycleway may increase
the number of walkers in the area rendering a large area of the forest poorer
for capercallie.Ó

15. The ecological assessment document includes a number of recommended
mitigation measures. The following is a summary of the assessment and
mitigation measures : -

NOTE: The section below is made up of or includes a table which cannot be 
converted to text. Please see original PDF for reference. 

Proposed activity Character of
unmitigated impact
Impact
significance
without
mitigation
Mitigation Residual
impact
significance
Cycleway and lay- by
construction
Increased noise from
heavy plant
Disturbance to wildlife
including red squirrel
drey
Very minor
adverse impact (at
local level)
probable
Restrict daily
construction hours to
08.00 and 18.00 and
work between October
and December in
vicinity of drey.
Insignificant
impact.
Removal of existing
vegetation
Small loss of habitat and
foraging for fauna. Loss
of several juniper.
Very minor
adverse impact (at
local level)
probable
Trans-locate juniper to
suitable nearby area
Insignificant
impact
Creation of car park
extension
Increased noise from
chain saws etc.
Disturbance to wildlife Very minor
adverse impact (at
local level)
probable
Restrict daily felling
hours to 08.00 to 18.00
Insignificant
impact
Tree felling and
vegetation clearance
Loss of foraging and
nesting habitat. Loss of
native trees.
Very minor
adverse impact (at
local level)
probable
Retain all wind firm
native trees and juniper
understorey. Fell in
September Ð March,
outside bird breeding
season.
Insignificant
impact.
Use of cycleway and
lay-bys
Potential increase in
cyclists and walkers
Noise and human
disturbance. May affect
capercaillie in the
adjacent woodland.
Minor adverse
impact unlikely /
probable
Do not promote for
use for other than
Badaguish residents
Minor adverse
impact
unlikely.
Potential small increase in
car traffic
Increased risk of fauna
(red squirrel) fatality.
Not significant Current speed
restriction adequate
Insignificant
impact

NOTE: The section below is made up of or includes images which cannot be 
converted to text. Please see original PDF for reference. 

Fig. 5: Ecological assessment and mitigation, as identified in the Ecology Assessment
submitted by Aquaterra Ecology.

DEVELOPMENT PLAN CONTEXT

National Policy
16. In the national context, Scottish Planning Policy5 is the statement of the
Scottish GovernmentÕs policy on nationally important land use planning matters.
Scottish Planning Policy supersedes previous Scottish Planning Policy
documents and National Planning Policy Guidance. Under the heading of Core
Principles, a number of broad principles which the Scottish Government believe
should underpin the modernised planning system are outlined and include:
	¥ The constraints and requirements that planning imposes should be
	necessary and proportionate;
	¥ The system should ÉÉallow issues of contention and controversy to
	be identified and tackled quickly and smoothly; and
	¥ There should be a clear focus on quality of outcomes, with due
	attention given to the sustainable use of land, good design and the
	protection and enhancement of the built and natural environment.

17. Para. 33 of Scottish Planning Policy focuses on the topic of Sustainable
Economic Growth and advises that increasing sustainable economic growth is
the overarching purpose of the Scottish Government. It is advised that Òthe
planning system should proactively support development that will contribute to
sustainable economic growth and to high quality sustainable places.Ó Planning
authorities are encouraged to take a positive approach to development,
recognising and responding to economic and financial conditions in considering
proposals that would contribute to economic growth.

18. Under the general heading of Sustainable Development, it is stated that the
fundamental principle is that development integrates economic, social and
environmental objectives, and that the Òaim is to achieve the right development
in the right place.Ó

19. Scottish Planning Policy includes a detailed section on Landscape and
Natural Heritage. Improving the natural environment and the sustainable use
and enjoyment of it is one of the GovernmentÕs national outcomes. Planning
authorities are required to support opportunities for enjoyment and
understanding of the natural heritage. It is noted in para. 127 that Òlandscape in
both the countryside and urban areas is constantly changing and the aim is to
facilitate positive change whilst maintaining and enhancing distinctive character.Ó

20. The topic of Open Space and Physical Activity is discussed in paragraphs
149 to 158 of the policy document. It is noted that Òaccess to good quality open
spaces and opportunities for sport and recreation make important contributions
to a healthier Scotland.Ó Planning authorities are required to consider access
issues and protect core and other important routes and access rights when
preparing development plans and making decisions on planning applications.
5 February 2010

Highland Council Structure Plan 2001
21. The Highland Structure Plan 2001 includes several policies that are broadly
applicable to the type of development proposed, including policies on sport and
recreation as well as tourism and the environment. The benefits of sport and
recreation facilities are highlighted in section 2.5.1 of the Plan, where they are
attributed to making an important contribution to sustainable development and
enhancing the health and quality of life of the residents of the Highlands. One of
the PlanÕs strategic themes include encouraging the Òadoption of a proactive
approach to the wise use of the natural environmentÓ.

22. Section 2.5.10 of the Plan concentrates on the subject of informal recreation and
access, noting that it is of very high importance, underpinning a range of
recreational pastimes and their associated quality of life benefits, as well as being
a key component of the tourism industry. The Plan however recognises that
increasing demands for access necessitates the achievement of a balance
between accommodating the needs of countryside users and protecting the
fragility of the Highland countryside. Section 2.5.13 of the Plan notes that the
Òprotection of rights of way and provision of an integrated system of well
maintained and signposted paths catering for walking, cycling and equestrian use
are a valuable resource for local communities and visitors, both in terms of
providing access and heightening appreciation of the wider environment.

23. The Highland Structure Plan also includes a number of detailed policies on
Tourism which are considered pertinent to the development proposal. Section
2.7.1 of the Plan describes tourism as a vital element of the Highland economy,
and notes that opportunities to participate in outdoor pursuits are amongst key
visitor attractions. The Structure Plan strategy aims to build on the Highland
identity and take a proactive approach to the wise use of the natural
environment as a primary resource for tourism. Section 2.7.1 also highlights the
fact that community needs should also be considered in order to ensure that
facilities and opportunities are provided which serve the needs of both visitors
and local residents.

24. Policy T2 of the Structure Plan aims to support high quality tourism
development proposals, particularly those which extend the season, spread
economic benefit more widely and provide opportunities for the sustainable
enjoyment and interpretation of the areaÕs heritage.

25. The Structure Plan includes a detailed section on forestry, noting that it is a
significant land use within the Highlands, and highlighting the fact that forests
increasingly serve a variety of purposes besides commercial timber production
(section 2.10.3). The opportunity to provide an important network of
recreational facilities, capable of accommodating a much higher number of
visitors than more open areas is emphasised.
26. The proposed site is located within a National Scenic Area. The Cairngorms
Mountains NSA has been designated for its landscape quality.

Badenoch and Strathspey Local Plan (1997)
27. The Local Plan details a number of pertinent conservation objectives and
states that the priority is to promote sustainable development of the areasÕ
resources and ensure an acceptable balance between economic growth and
safeguards for the outstanding heritage. The conservation strategy advocated
for the countryside includes provision being made for the restoration and
expansion of the core Caledonian Forest, and the upgrading of facilities for
recreation, tourism, interpretation and education / research in more robust
locations. In particular, multiple use of forest areas is encouraged.

28. The proposed cycleway is located on land identified as the Glenmore Corridor
in the Badenoch and Strathspey Local Plan (1997). The majority of the
route is within a Site of Special Scientific Interest.6 The Plan states that Òthe
Council recognises the integrity of the corridor linking from the Spey into the
Cairngorms, its distinctive conservation features and the mounting visitor
pressure.Ó The general development policy for the area is outlined in section
4.14.1 of the Plan where it is stated that reasonable consolidation and
improvement of established businesses is acceptable in principle, although a
strong presumption will be maintained against further new development
throughout the area Òexcept where this is considered essential for the proper
management of visitors.Ó It is the policy to avoid conflict between users and
activities, hazard or jeopardy to public safety or damage to the environment.

29. The general topic of Tourism and Recreation is addressed in Policy 2.2.9 of the
Local Plan where it is acknowledged that tourist activities will continue to make
a vital contribution to the economy. The priority is to ensure that broadening
the range and quality of facilities is balanced with protecting the areaÕs
exceptional scenic and heritage resources. The Local Plan also states that the
more accessible intermediate lowland areas have potential for a broad range of
activities and that provision should be made for upgrading recreation, tourism,
interpretation and education / research facilities in the more robust locations
better able to absorb visitor pressure. Multiple use of forest areas in particular is
encouraged.

Cairngorms National Park Plan (2007)
30. The Cairngorms National Park Plan has a number of strategic objectives
that provide a long term framework for managing the National Park and working
towards a 25 year vision. The strategic objectives are set out under three broad
headings Ð (i) conserving and enhancing the park; (ii) living and working in the
park; and (iii) enjoying and understanding the park.

31. In terms of conserving and enhancing the park, the specific objectives are
intended to ensure the management of the natural and cultural heritage of the
Park whilst recognising the interdependence between the special qualities and
the important links to the socio-economic viability of land management,
businesses and communities. The Park Plan includes a strategic objective for
Landscape, Built and Historic Environment, which has a number of aspects
including maintaining and enhancing the distinctive landscapes across the park
and ensuring that development complements and enhances the landscape
character of the park. Also in relation to the conservation and enhancement of
the Park, the subject of biodiversity is addressed in considerable detail.
Reference is made to Natura 2000 sites7 and it is highlighted that there is an
Òobligation by law to prevent any activities being undertaken which are likely to
have an adverse impact on the qualifying features of interest, unless such impact
would be caused by an activity that is in the overriding public interest and for
which, there was no available alternative. One of the strategic objectives for
biodiversity which is of particular relevance to the current application is to
Òdevelop awareness and understanding of the interactions of land-uses, tourism,
outdoor access and nature conservation amongst other interests.Ó
6 North Rothiemurchus Pinewood SSSI.

32. Continuing on the theme of conserving and enhancing the Park, the Plan includes
strategic objectives for Forest and Woodland Management. Objectives include
promoting multi-objective forest and woodland management that delivers
environmental, economic and social benefits and also promoting the value of
forests and woodlands as a major sustainable tourism asset, increasing the
derived economic benefits to woodland owners and local communities.

33. Under the heading of ÔEnjoying and Understanding the ParkÕ the Park Plan
alludes to the fact that the Cairngorms National Park is known for its
outstanding environment and outdoor recreation opportunities and that this in
turn requires Òa sustainable approach to developing tourism, an excellent quality
provision of outdoor access and recreation opportunities and a significantly
enhanced awareness and understanding of the National Park, its special qualities
and management needs.Ó The Plan also emphasises that enjoyment of the area is
not only relevant to those people travelling to the Park, but is also part of the
everyday experience of those living in and around the area. There are a number
of strategic objectives which are of relevance in relation to ÔSustainable
Tourism.Õ Objectives include improving and maintaining the quality of the
experience in the Park for all visitors, communities and those working within the
tourism industry; developing and maintaining a wide range of opportunities for
visitors to experience and enjoy the special qualities, distinctiveness and natural
and cultural heritage of the Park; and also to encourage an optimum flow and
spread of visitors across the Park and minimise social and environmental impact
including traffic generated by visitors and conflicts between different forms of
recreation.

34. A specific section of the Park Plan addresses the subject of ÔOutdoor Access and
RecreationÕ and strategic objectives of relevance to this proposal include Ð
encouraging people of all ages and abilities to enjoy and experience the outdoor
environment; developing a co-ordinated approach to the sustainable
management of high quality outdoor access and recreation by the public, private,
community and voluntary sectors; planning for outdoor recreation needs and
opportunities in a co-ordinated way across sectors; and developing a high
standard of responsible management of outdoor access based on a common
understanding of the needs of access managers and users.
7 Natural 2000 is a European network of protected sites which represent areas of the highest 
value for habitats and species of plants and animals which are rare, endangered or 
vulnerable in the European Community. The network includes Special Areas of 
Conservation and Special Protection Areas.

35. Emanating from the strategic objectives, the Cairngorms National Park Plan
identifies Priorities for Action. This is essentially a programme of work in key
areas for the five year period from 2007 Ð 2012. One of the priorities is to
provide high quality opportunities for outdoor access and amongst the specific
actions identified to achieve this is to improve or extend strategic routes. The
recently completed Aviemore to Glenmore off-road route was one of the
specific actions identified.8

CONSULTATIONS
36. Scottish Natural Heritage (SNH) considered the proposal and in
accordance with the casework agreement between SNH and CNPA the
response focuses on the impact of the proposals for designated natural heritage
features and European Protected Species - the response therefore focuses on
the walk / cycleway element of the proposal.9 SNH has no objection to the
proposed walk / cycleway but recommends a number of conditions in order to
avoid adverse impacts on designated sites. Recommended conditions include a
requirement to reposition one of the proposed passing places in order to avoid
damage or removal of juniper or Scots pine trees; construction work to take
place outside the bird breeding season; the inclusion of measures to protect
European Protected Species during construction activity; and measures to
protect a wood ant nest in the vicinity of the proposed walk / cycleway.

37. SEPA considered the development proposal, although noting at the outset that
the proposal generally falls below the threshold for SEPA to provide detailed
comment. Nonetheless it was noted that the proposed walk / cycleway crosses
minor watercourses and it was advised that should there be a steady flow of
water in these, that bridging rather than culverting would be preferable in order
to ensure a free flow of water at times of high rainfall runoff.

38. In terms of the car parking area SEPA noted that the surface would be
permeable, that cut off drains are proposed and that filter trenches would be
installed around the car park to catch any ground or surface water flows. There
is no objection to the development proposal. It is however advised that the
developer should ensure that the overall development is compliant with CAR
regulations 2005, GBR 10, 11 and 21, specifically for the SUDs requirements
during the construction phase and after.

39. Highland CouncilÕs TEC Services division has no objection to the proposed
works. Comment was offered on the originally proposed location of the passing
places Ð it was suggested that the proposed additional passing places should be
positioned on the south and east sides of the existing access road in order to
avoid conflict between pedestrians / cyclists and motor vehicles. This suggestion
was taken on board by the applicants and the proposal was amended to show
the proposed passing places located on the opposite side of the existing access
road.) The response from TEC Services also suggested that there should be
intervisibility between passing places and that the passing places should be signed
as such.

8 Other works identified include the extension of the Speyside Way to Newtonmore, ensuring that
the Speyside Way is suitable for the widest possible variety of users, and the completion of the
Deeside Way to Ballater.
9 SNH and the CNPA Heritage and Land Management Group have agreed that the proposed car
parking element will be considered by HLM.


40. Aviemore and Vicinity Community Council was consulted on the
proposals and advised of no comments to make on the application.

41. The CNPAÕs Visitor Services and Recreation Group (VSRG) considered
the proposals from an access perspective. The path construction technique and
specifications are generally acceptable, although some comment was made about
the cross fall and gradient. Similar to TEC Services VSRG expressed some
concern at the originally proposed location of passing places on the western side
of the path / cycleway. The final point raised by VSRG was in relation to the
Old Logging Way which enters the site at the public road end. As the route is
popular and widely used VSRG suggest that temporary signage should be
installed on the route to forewarn users that they are entering a construction
site. It is also advised that disruption to users of the Old Logging Way should be
kept to a minimum during any construction activity.

42. The CNPAÕs Heritage and Land Management Group (HLM) considered
the landscape and ecology implications of the proposed development. There is
no landscape objection in principle. The site is noted as being within Glenmore
Forest with the Badaguish Centre described as sitting in an enclosed clearing of
open grassland, cabins and recreational infrastructure. The site cannot be seen
from any distance and it was noted that even from elevated viewpoints on the
Meall a Bhuachaillle ridge that it cannot be readily distinguished within the
surrounding woodland. Although it is noted in the response from the Landscape
Officer that the site in itself does not contribute significantly to the landscape or
scenic quality of the national park, it is recognised that the site is used by groups,
families and individuals here to enjoy all that the National Park has to offer and
in that respect the quality of the on-site experience is important.

43. HLM note that the kind of development proposed can be accommodated
without major impact on the local landscape. The detail of the design and how it
is carried out is critical to minimising adverse effects and optimising the positive
qualities of the site. The main landscape ÔriskÕ is described as being poor quality
developments that do not integrate well with the woodland setting, or the
existing Badaguish complex. In order to safeguard against this various mitigation
measures were suggested, including planting internal trees and shrubs to break
up the extent of the proposed car parking area and also create shelter. This
suggestion was taken on board by the applicants and the most recently received
detailed layout plan for the car parking area includes planting proposals. In
relation to the proposed walk / cycleway, the landscape officer has suggested
that it should be separated from the existing road by retaining a strip of
vegetation (heather and blueberry) in order to avoid the path appearing as an
extension of the road surface. It is also recommended in the event of the
granting of planning permission that a planting plan and schedule is required, and
that detailed proposals should also be provided regarding measures to protect
the planting from grazing animals etc., as well as proposals for aftercare.

44. In terms of the ecology of the area, HLM recognise that a limited area of the
proposed car parking site is on land which is part of the Ancient Woodland
Inventory (AWI). Whilst there would usually be merit in requiring the retention
of trees on land within the Ancient Woodland Inventory, in this particular
instance it is noted that the portion of the proposed site which is affected is on
the periphery of the AWI designation and it primarily comprises of a spruce
plantation, the loss of which is not considered to be significant. HLM also note
that a squirrel survey was undertaken and has been submitted as part of the
package of supporting information. However, as the survey was carried out in
Autumn 2009 it is recommended that a further red squirrel survey be carried
out not more than two weeks prior to the felling of trees on the site.

REPRESENTATIONS
45. The proposal was advertised in The Strathspey and Badenoch Herald on
September 23rd 2009. Two letters of representation have been received Ð from
Johnnie Grant of Rothiemurchus Estate and from Forestry Commission
Scotland. Both are owners of land on which the development is proposed.

46. Mr. Grant of Rothiemurchus Estate confirms in his letter that the Estate
supports the concept of building this Òlast remaining section of the Aviemore to
Glenmore off-road route.Ó There is no objection to a planning application to
the same design and principles followed by the rest of the route.10 Reference is
also made to other requirements in the letter such as the need to incorporate
crossing points for estate timber and areas for stacking and turning.
CNPA comment: The requirements are matters which are not part of the
development proposal and are essentially matters that should be most
appropriately addressed by the applicant in the course of negotiations with the
landowner in securing authorisation to carry out development on
Rothiemurchus Estate lands.

47. Forestry Commission Scotland (FCS) note at the outset of their letter of
representation that the proposal is largely on a national forest estate managed
by FCS, with a small part of the proposed cycleway situated on the neighbouring
ground of Rothiemurchus Estate. FCS clarify that Òno agreement has been
reached between the applicant (Speyside Trust) and Forestry Commission
Scotland over the construction and management of these proposed facilities.Ó
Reference is made to the various designations affecting the proposed
development site (Glenmore Forest SSSI and Cairngorms SPA and SAC).

48. FCS refer to the environmental information submitted in support of the
application and note that it estimates that most residual impacts would be
10 The route referred to is the Old Logging Way.
insignificant, with the exception of a potential increase in cyclists and walkers on
the cycleway. The letter from FCS also refers to a Ôpotential increase in
Badaguish visitors present in new camping area.Õ In order to assess the potential
levels of disturbance, Forestry Commission Scotland sought information from
the applicant regarding changes in the capacity and occupancy at Badaguish.
Following receipt of this it is stated that Òquestions remain whether both these
proposed developments combined will increase visitor pressure and disturbance
in this part of Glenmore forest and the protected area.Ó In summary, FCS
consider that overall there are suggestions of increased disturbance, Òbut it
appears that taken alone the cycle-way and the car park may not increase
disturbance.

49. Other comments offered in the letter of representation from Forestry
Commission Scotland include recognition that safety has been presented as the
need for the cycleway and car park and also an acceptance that reduced traffic
within the Badaguish complex has the potential to improve on site safety.
Reference is made to the ancient woodland status of part of the proposed car
park site and it is also commented that no detail has been provided on how the
proposal integrates with the Scottish Governments policy on the control of
woodland removal. Finally in relation to the proposed cycleway, it is suggested
that its impact could be reduced by planting trees and shrubs of native species
adjacent to the cycleway in order to help a screen develop between cycleway
users and the adjoining forest. This would be of assistance in reducing
disturbance in the adjoining woodland.
50. CNPA comment: A number of comments contained in the letter from Forestry
Commission Scotland relate to concerns associated with potential future
developments which are not part of this current planning application. It is
understood that the reference to Ôpotential increase in Badaguish visitors
present in the new camping areÕ relates to a potential development proposal for
the relocation of the canvas camping area, a phased development of timber
wigwam tents, and the development of a mountain bike free-ride skills area with
adventure trail, all of which is the subject of a formal Pre Application
Consultation. The proposal is not the subject of this current planning
application, and it is necessary to consider this application on its own merits. It
would be inappropriate for the CNPA acting as Planning Authority to base the
assessment of this current planning application for the walk / cycleway and car
park on perceived impacts of any future developments which might potentially
be proposed in the vicinity.

APPRAISAL
51. On the basis of national, regional and local level planning policy as outlined in
earlier sections of this report, the principle of this type of recreational
development is generally acceptable. Matters which it has been necessary to
take into account in assessing the proposed development include the nature and
extent of the proposal, the background to the need for the proposed
development, and the fact that much of the land on which it is proposed is the
subject of several natural heritage designations and the consequent need to
establish that the proposals do not impact negatively in the interests for which
the sites have been designated.

52. The background to the need for the proposal is derived primarily from safety
concerns. The termination of the recently developed Old Logging Way at the
entrance to the single track access to Badaguish has resulted in walkers / cyclists
/ other non vehicle users emerging from the Old Logging Way onto the access
road. The proposed new walk / cycleway would resolve potential conflicts
between non vehicular and vehicular users, by offering the opportunity to
separate the two distinct traffic streams. Approximately 350 metres of the walk
/ cycleway would serve as the last remaining section of route that would provide
the opportunity for non vehicular users to journey entirely off Ðroad from
Aviemore to Glenmore, by continuing from the Old Logging Way onto the new
walk / cycleway and then exiting onto the existing track to the east before
continuing towards Glenmore. The remainder of the proposed new walk /
cycleway would facilitate users of the Badaguish complex.

53. The need for the proposed new car parking facility close to the main area of the
Badaguish complex has also been outlined (para. 8 and 9). In terms of the safety
element, the new car parking facility would minimise the need for sporadic
parking and associated vehicular movement throughout the site. It would also
provide designated car parking provision for major events, thereby minimising
the impact of temporary car parking on such occasions in more sensitive
surrounding areas. The safety benefits of the proposed development have also
been accepted by Forestry Commission Scotland in their letter of
representation. In terms of other points raised by FCS in particular regarding
potential impacts of increased disturbance from visitors in a new camping area,
as discussed in paragraph 49 this does not form part of the current proposal nor
is it the subject of a planning application at the present time. The extent of
information provided by the applicant / agent in support of the current planning
application is sufficient to satisfy queries raised by the CNPA in the course of
the assessment, and confirms that the proposed car parking is required in
connection with the efficient operation of the existing facilities at Badaguish.

54. The extent of development which is proposed within sites which are the subject
of European designations (Cairngorms SAC and SPA) and national designations
(North Rothiemurchus Pinewood SSSI, Glenmore Forest SSSI) is relatively
limited, concerning only the walk / cycleway and associated passing places. The
impact of the development on the interests for which the sites have been
designated has been comprehensively assessed by Scottish Natural Heritage,
with the assessment assisted by supporting information, in the form of ecological
surveys and impact assessment, which accompanied the planning application.
SNH is satisfied with the proposals subject to a number of conditions being
included in the event of the granting of planning permission. The required
conditions would ensure that juniper and Scots pine in the vicinity of one of the
proposed passing places would be protected, as well as ensuring that measures
would be put in place to ensure the protection of breeding birds, otters and ants
nests.

55. The proposed car parking areas lies outwith the majority of designated sites. A
small area of the identified site is within the Ancient Woodland Inventory.
Planting in this area consists mainly of spruce plantation and has the general
appearance of a standard commercial forestry plantation. As detailed in
foregoing sections of the report, the impact of this area of the proposed
development has been considered by the CNPAÕs Heritage and Land
Management Group. Various suggestions made in the initial consultation
response (such as the inclusion of internal planting and the creation of a softer
less rigid edge planning of native trees and shrub species) have been taken on
board, with a revised and more detailed site layout plan being provided for the
car parking area. In addition car parking is proposed to be curtailed to the
southern area of the site and would not therefore interfere with or result in any
works being undertaken in the vicinity of the burn which runs through the site.
While it is recognised that the creation of the new car parking area would
necessitate the felling of some of the spruce plantation on the site, the overall
landscape impact is acceptable, particularly when the development is considered
in the context of its proximity to and relationship with the existing facilities at
Badaguish, all of which are contained within the clearing in the woodland.

56. Responses from SNH and HLM, as well as reference in the letter of
representation from Forestry Commission Scotland, all refer to the benefits of
potential additional landscaping in the vicinity of the proposed walk / cycleway.
The provision of appropriate landscaping, of native species, would assist in
minimising the visual impact of the new path, would emphasise the separate
nature of the new path from the existing access road, and would also discourage
users from venturing into the wider woodland area.

57. In conclusion, the proposed development is acceptable. Adequate justification
has been provided regarding the need for the walk/ cycleway and the car parking
area, with safety within the main area of the Badaguish complex as well as on the
approach to it being the principle objective. Both elements of the development
proposal are intended to provide improved opportunity for existing users of the
facility. The development proposals are ancillary to the existing facilities at
Badaguish and are not attractions in their own right. As such they would be
unlikely to give rise to increased use of the area and would not therefore result
in increased disturbance to natural heritage interests in the wider area.
Acceptance of the principle of the currently proposed development does not
imply acceptance of or any prejudgement of any future development proposals
that may occur within the area in connection with the Badaguish Outdoor
Centre.

IMPLICATIONS FOR THE AIMS OF THE NATIONAL PARK

Conserve and Enhance the Natural and Cultural Heritage of the Area
58. The proposal involves development within a number of sites designated for their
natural heritage interests. The nature and extent of the proposal is relatively
limited and through the implementation of adequate safeguards, can be
developed without adverse impact on the natural heritage interests of the area.
In addition, the undertaking of appropriate landscaping works in the vicinity of
the walk / cycleway and also interspersed within the car parking area could be
considered as an opportunity to enhance the natural heritage of the area.

Promote Sustainable Use of Natural Resources
59. There are no significant negative impacts associated with the proposed
development.

Promote Understanding and Enjoyment of the Area
60. The proposed walk / cycleway would facilitate an improved and safer means of
passage through the area for non vehicular users. This would provide an
improved opportunity to enjoy this part of the National Park. The provision of
a new car parking facility on the Badaguish site would provide an opportunity to
minimise traffic movement and sporadic car parking throughout the site and
would therefore enhance the experience of users of the facility.

Promote Sustainable Economic and Social Development of the Area
61. The proposal would provide a safer environment for users of the Badaguish
facility. The improved safety element may be of benefit in encouraging specific
groups to continue to use the facilities. The proposal could therefore be
considered of benefit to the socio-economic development of the community and
the wider area.

RECOMMENDATION
That Members of the Committee support a recommendation to:
Grant Full Planning Permission for the formation of walk / cycleway;
formation of passing places and additional car parking at Speyside Trust,
Badaguish Outdoor Centre, Glenmore, subject to the following conditions

1. The development to which this permission relates must be begun within three
years from the date of this permission.
Reason: To comply with Section 58 of the Town and Country Planning (Scotland) Act
1997 or amended by the Planning etc (Scotland) Act 2006.

2. Unless otherwise agreed in writing with the Planning Authority, use of the
walk/cycleway hereby permitted shall only be by pedal cycle or any other
means of access permitted in accordance with the Scottish Outdoor Access
Code.
Reason: In the interests of public safety.

3. Prior to the commencement of development, amended plans shall be
submitted for the agreement of the Cairngorms National Park Authority acting
as Planning Authority, in consultation with Scottish Natural Heritage, to show
passing place no. 3 repositioned to avoid damaging or removing juniper and
Scots pine in the vicinity. Details shall also be provided of the measures
proposed to protect the juniper and Scots pine in the vicinity during the
course of construction activities. Thereafter all works shall be undertaken in
accordance with the agreed measures.
Reason: In the interests of protecting sensitive vegetation in the vicinity and in order to
conserve and enhance the natural heritage of the area.

4. No development associated with the walk / cycleway shall be undertaken
during the recognised bird breeding period between April and mid July
inclusive, unless otherwise agreed in writing with the CNPA acting as Planning
Authority, in consultation with Scottish Natural Heritage.
Reason: In order to protect nesting birds and in the interests of conserving and
enhancing the natural heritage of the area.

5. Prior to the commencement of development, details shall be submitted for the
agreement of the Cairngorms National Park Authority acting as Planning
Authority, in consultation with Scottish Natural Heritage, to demonstrate that
adequate measures will be put in place during the course of construction to
ensure the all European Protected Species, including otters and wildcats are
protected. All agreed measures shall be implemented in full thereafter.
Reason: To ensure that appropriate protection is afforded to European Protected
Species and in the interests of conserving and enhancing the natural heritage of
the area.

6. Prior to the commencement of development the wood ant nest identified
opposite passing place no. 3 (survey Ð September 2009) shall be marked with
tape, and the marking shall be maintained in position for the duration of the
construction period to ensure that the ant nest is protected during the
construction period.
Reason: To ensure that adequate protection is afforded to a SSSI designated feature and
in order to conserve the natural heritage of the area.

7. The walk / cycleway shall not be promoted as a new recreational facility in the
area. The only form of signage permitted shall be warning signage, of a
temporary nature, erected and maintained in place for the duration of the
construction works. Prior to the commencement of development details of
the extent of all temporary warning signage, including its contents and the
identification of signage locations, shall be submitted for the agreement of the
Cairngorms National Park Authority acting as Planning Authority. The signage
shall be erected thereafter in accordance with the agreed proposals and shall
remain in place for the duration of construction activities.
Reason: To limit disturbance of the designated features of interest and in the interests
of ensuring that adequate warning is provided in advance of construction
activities in order to protect the general safety of users of the area.

8. Prior to the commencement of development, details of the nature of the
proposed crossings of the watercourses along the route of the walk / cycleway
shall be submitted for the written agreement of the Cairngorms National Park
Authority acting as Planning Authority, in conjunction with SEPA. The water
crossing shall be constructed in accordance with the agreement thereafter.
Reason: To ensure that the method of construction of water crossing does not impede
the free flow of water.

9. Prior to the commencement of development a detailed site specific
construction method statement shall be submitted for the written agreement
of the CNPA acting as Planning Authority, in consultation with SEPA. The
agreed construction method statement shall be implemented in full during
works on the site.
Reason: In the interests of environmental protection and in the interests of conserving
the natural heritage of the area.

10. Prior to the commencement of development a landscaping plan shall be
submitted for the agreement of the Cairngorms National Park Authority acting
as Planning Authority, to show comprehensive proposals for internal planting
within and on the boundaries of the car parking area, planting proposals for the
area to the north of the burn opposite the car parking area, and the provision
of a strip of retained vegetation either side of the walk / cycleway. The
landscaping plan shall include details to specifying the quantity, position, size,
species and protection measures (tree shelters, stakes and ties) of all trees /
shrubs to be planted. The landscaping shall consist of native species.
A maintenance programme shall also be submitted in conjunction with the
landscaping plan. The landscaping shall be carried out in accordance with the
agreed plan and shall be completed within one year of the commencement of
works. Any trees or shrubs that die or become seriously damaged or diseased
within a period of five years from the time of planting shall be replaced with
others of a similar size and species, suited to the climate of the area, within the
next planting season.
Reason: In the interests of visual amenity, to ensure a satisfactory standard of local
environmental quality and in the interests of enhancing the natural heritage of
the area.

11. Prior to any tree felling works being undertaken on the car park site a prefelling
red squirrel survey shall be undertaken of all trees to be felled and the
results shall be submitted for the written agreement of the Cairngorms
National Park Authority acting as Planning Authority, which shall be obtained
before any development proceeds. The pre-felling red squirrel survey shall not
be undertaken more than two weeks in advance of the intended felling date. In
the event that any squirrel drey is found to be present no work shall be
undertaken without the written permission of the CNPA.
Reason: In the interests of ensuring adequate protection of protected mammal species
and in the interests of conserving the natural heritage of the area.

12. Unless otherwise agreed in writing with the Cairngorms National Park
Authority acting as Planning Authority, working operations at the site shall be
restricted to the hours of 0800hrs to 1800hrs (Monday to Friday) and 0800hrs
to 1300hrs (Saturday) and at no time on a Sunday.
Reason: To protect the general amenity of the area and in the interests of minimising
disturbance to wildlife.

Advice notes:
A. Measures required in fulfilment of condition no. 5 of this permission to
ensure the protection of European Protected Species, include but are not
limited the following :
¥ contractors being made aware that otters and wildcats may pass along
the site; and
¥ that no equipment or excavations that may entrap an otter or wildcat
are left unattended.
B. The planning consultation response from SEPA highlights that the overall
development should be compliant with CAR regs, 2005, GBR 10, 11 and 21
specifically for the SUDs requirements during the construction phase and
after.
C. Red squirrels are one of a number of species protected under Schedule 5 of
the Wildlife and Countryside Act 1981 (as amended under the Nature
Conservation (Scotland) Act 2004). Section 9(4) of the Act makes it an
offence to intentionally or recklessly damage a red squirrel drey.
It is now an offence to intentionally or recklessly
¥ Kill, injure or take (capture) a red squirrel;
¥ Damage, destroy or obstruct access to any structure or place which a
red squirrel uses for shelter or protection;
¥ Disturb a red squirrel whilst it is occupying a structure or place which
it uses for that purpose

Mary Grier
planning@cairngorms.co.uk
23 March 2010

The map on the first page of this report has been produced to 
aid in the statutory process of dealing with planning applications.
The map is to help identify the site and its surroundings and to 
aid Planning Officers, Committee Members and the Public in the
determination of the proposal. Maps shown in the Planning Committee 
Report can only be used for the purposes of the
Planning Committee. Any other use risks infringing Crown Copyright 
and may lead to prosecution or civil proceedings. Maps
produced within this Planning Committee Report can only be reproduced 
with the express permission of the Cairngorms National Park Authority
and other Copyright holders. This permission must be granted in advance.