CAIRNGORMS NATIONAL PARK AUTHORITY 
Planning Paper 4 6 March 2009 

CAIRNGORMS NATIONAL PARK AUTHORITY 


Title: REPORT ON CALLED-IN PLANNING APPLICATION 

Prepared by: HILARY MACBEAN, PLANNING OFFICER (DEVELOPMENT MANAGEMENT) 

DEVELOPMENT PROPOSED: DEMOLITION OF CONVERTED STEADING 
AND ERECTION OF REPLACEMENT HOUSE AT BALNAGOWAN STEADING, 
BALNAGOWAN BRAE NETHY BRIDGE 

REFERENCE: 08/228/CP 

APPLICANT: WILBURN HOMES LTD., C/O MBM PLANNING AND DEVELOPMENTALGO 
BUSINESS CENTRE, GLENEARN ROAD, PERTH 

DATE CALLED-IN: 30 JUNE 2008 

RECOMMENDATION: APPROVAL 


Fig. 1 - Location Plan 


PAGE 2

SITE DESCRIPTION AND PROPOSAL 

Fig. 2 - Colour photo of Balnagowan Steading looking West from Balnagowan Brae 

1. The site is located to the North side of Balnagowan Brae just as it 
turns and descends into the centre of the village. Balnagowan 
Brae is a C Class road on the eastern approach to the village, 
entering from Tomintoul and Dorbrack. The site is embanked at 
the road side, made up of generally flat partially made up 
ground on the top and then slopes gently down to the North and 
West. The site is covered by a Tree Preservation Order that does 
not include the Poplar Trees over the North boundary. 

2. Balnagowan Steading is located towards the West end of the 
site and is a traditional, probably 19th Century, two storey former 
farm building built in partially dressed granite blocks. It has been 
built into the North facing embankment so appears as single 
storey with roof accommodation from the East and South and 
two stories from the North and West. It appears to have been 
built over an older rubble built structure now completely 
consumed within the embankment and current building. 


PAGE 3

Fig. 3 - Colour photo of East Elevation 


Fig. 4 - Colour photo of South elevation with Balnagowan farmhouse in background 

3. To the immediate West is a newly built single dwelling house that 
faces North and shares the same access as the proposed site. 
The existing new house is both marginally higher (200mm) and set 
marginally lower than the steading. The proposed new house 
would be at the same level as the steading with a ridge height to 
match the new house. 

4. To the North, the boundary is marked by a row of thin Poplars 
and then continues to slope down steeply across an area of 
open amenity land towards the Nethy Bridge Hotel and 
Grantown Road. To the North East is Balnagowan (a former 
farmhouse) and, well separated from the site by Balnagowan 
and intervening trees, a new development of 10 detached 
houses currently under construction on allocated land. 


PAGE 4

Fig. 5 - Colour photo looking South from Mountview Hotel, across the amenity open 
space. Balnagowan steading and the adjacent new house in the 
middle distance. 

Fig. 6 - Colour photo of Balnagowan steading and the adjacent new house viewed 
across the open amenity land from Grantown Road 

5. To the South and East, Balnagowan Brae, the public road, is 
bound by trees and embankments descending Westwards, 
towards the village. Beyond the trees to the South, are distant 
views of the Cairngorm mountain range. The opposite (southern) 
embankment has been cultivated as a small public amenity 
space, including a seat and viewpoint towards the village. The 
site and existing steading are visible from this point and from the 
Brae as it approaches the village centre from the East 
(Dorbrack). 


PAGE 5

Fig. 7 -  Colour photo of Balnagowan steading viewed from the amenity area on 
Balnagowan Brae 

6. There is an extant planning permission for extensions to the 
steading which would involve obscuring both the existing South 
gable facing the road and more than half of the East side facing 
Balnagowan. Planning permission for a new house on the land to 
the East of the site was refused and dismissed at appeal in 
January 2008 on the grounds that it would be in a conspicuous 
elevated position between existing traditional buildings where it 
would obscure views across the open space to the North. It 
would also be a cramped development in relation to the 
spacing between it and the steading. The design of the house it 
itself was found to be satisfactory but it would look out of place 
between traditional buildings, particularly as it would face away 
from the public road. 

7. It is proposed to demolish the existing converted steading and 
replace it with a single dwelling house in the same orientation 
but 1 metre further East than the footprint of the steading. The 
proposed access would be from Balnagowan Brae and the new 
access to the housing development to the North East. The shared 
driveway also serves the new house to the West. 

8. The proposed house would be finished in stone recovered from 
the existing steading and timber facings to the garage, porch, 
conservatory and dormer cheeks. The roof would be slated. The 
design has been amended to improve its traditional elements, 
increase the use of stone down takings and to align the height of 
the ridge of the roof with the adjacent new house. 


PAGE 6

Fig. 8 - Site Levels 

Fig. 9 - Elevations and Plans 



PAGE 7

DEVELOPMENT PLAN CONTEXT 

Cairngorms National Park Plan 2007 

9. Strategic objectives for Landscape, Built and Historic Environment 
include; ensuring that development complements and 
enhances the landscape character of the Park; with new 
developments within settlements and surrounding areas 
complementing and enhancing the character, pattern and 
local identity of the built and historic environment. 

National Planning Policy 

10. NPPG 18 Planning and the Historic Environment: states that the 
historic environment “has tremendous visual appeal, provides 
inspiration and enjoyment and helps reinforce a sense of local, 
regional and national identity. Scotland's historic environment is 
characterised by its diversity…… More modest historic buildings, 
townscapes and landscapes are valued for their distinctive style 
and character, quality of workmanship, and important 
archaeological remains. The historic environment is of immense 
importance for education, recreation, leisure, tourism and the 
wider economy”. 

11. PAN 52 Planning in Small Towns: states that “The future for small 
towns does not involve turning the clock back but it should 
involve an appreciation of their historical development and an 
understanding of how market forces and social trends can be 
harnessed. Planning for small towns should be underpinned, inter 
alia, by identifying, safeguarding and reinforcing a sense of 
place and local (heritage) assets “in the interests of local 
distinctiveness and character. 

Highland Structure Plan 2001 

12. Policy G2 (Design for Sustainability) considers that proposed 
developments will be assessed on the extent to which they are 
compatible with service provision, are accessible by public 
transport, cycling and walking, maximise energy efficiency, 
make use of brown field sites, existing buildings and recycled 
materials, impact on individual and community residential 
amenity, impacts on landscape, habitats, species, cultural 
heritage, promote varied, lively and well used environments and 
contribute to the economic and social development of the 
community. In relation to housing the structure plan’s strategic 
objectives aim to steer housing development to appropriate 
locations within existing settlements. 


PAGE 8

Badenoch and Strathspey Local Plan 1997 

13. The policy thrust of the Plan links social and economic 
development to maintaining the cultural and natural 
environment, with recognition of the need to improve urban 
design and enhance the character and identity of all the 
villages. Policy objectives for Nethy Bridge include maintaining a 
scale and form of development compatible with the village 
character. The site lies within the village envelope and Policy 
4.1.3. (Infill) is relevant. In the interests of safeguarding the 
character of established residential areas, this policy provides a 
presumption against development that would involve 
inappropriate scale, design or orientation, inadequate plot size 
and spacing, the breach of established building lines, tree felling, 
loss of privacy and amenity of neighbours and substandard 
access. 

To the North of the site is a defined area of restraint, 
complimented by an area of amenity open space reserved from 
the current housing development. The resultant open grassy field 
area is important to the character and amenity of the village, 
including two important local hotels. This area is safeguarded by 
Policy 4.5.2 of the Local Plan. 


CONSULTATIONS 

14. Nethy Bridge Community Council: The applicant and agent met 
with the Community Council before the application was made 
and at that stage the Community Council did not raise 
objections. Subsequently the Community Council stated in 
writing that a fine house would be created but not necessarily 
right for this site. They are unconvinced that the existing building 
is beyond repair. The site is very prominent and visible to many so 
restoration of the existing building is preferable to its demolition 
and replacement. A new building would ruin a very prominent 
part of the village. 

15. Heritage and Land Management (Landscape Officer) states that 
the site is in an elevated location in relation to the road and is 
visible from the East. The steading and Balnagowan farmhouse to 
the East together form a pair on either side of the access road to 
the new Wilburn Homes housing development, contributing to 
the streetscape and character of the area. The proposed house 
has traditional elements but lacks the authenticity of the existing 
structure. The removal of the traditional building would weaken 


PAGE 9

the local character by reducing the stock of such buildings and 
eliminating its relationship with Balnagowan Farmhouse and 
therefore there is an objection to the proposal on landscape 
grounds. The site should be enhanced by appropriate planting 
and most importantly a stone wall to the boundary of the 
garden. A condition is recommended. 

16. Heritage and Land Management (Ecologist): the building is of an 
age and type that could have bats roosting in the structure. A 
bat survey is a legal requirement before planning permission is 
granted. In the event that there are bats currently using the 
building a licence to disturb the bats through the demolition is 
required from Scottish Government via SNH. If the demolition is 
delayed until the summer breeding season, a further survey 
would be required and if necessary a licence obtained. A 
licence is also needed to disturb any nesting birds. 

17. Forestry Officer states that a more detailed landscape plan is 
required. The roots of the existing Poplar Trees to the North have 
already been compromised by the repositioning of the access 
lane to the existing new house. They are also very closely spaced 
and would benefit from being thinned out. They should be 
closely monitored and a replacement planting scheme put in 
place. They are situated within 10m of the proposed gable of the 
new dwelling (and the steading). There should be no new 
development within 15 metres of the trees. 

18. Archaeology states that the building is depicted on the first 
edition of the OS map dated c.1870. It is of historic interest and 
should not be further altered without a visual record fist being 
made. This can be dealt with by condition. 

19. Contaminated Land Officer states that the building has been in 
previous use for agriculture. An assessment of potential 
contamination should be made prior to the commencement of 
development. The agent completed the Highland Council 
questionnaire, confirming that there is no knowledge of any 
contamination at the site. 

20. Highland Council Roads Authority recommends planning 
conditions relating to sight lines, gates, parking and surfacing. 


REPRESENTATIONS 


PAGE 10

21. A total of 21 letters of objection have been received. Concerns 
raised can be summarised as follows: 

• Balnagowan steading is one of the older historic stone 
buildings, providing a visible link to the agricultural past of 
the village, witnessed by its present juxtaposition with 
Balnagowan Farm House. It is part of the history and “feel” 
of the village. It appears to be in good repair and its 
removal would be detrimental to the rural character of 
Nethy Bridge, 

• The replacement house would have a detrimental impact 
on the amenity of the area in terms of prominence, style 
and scale and would not be in-keeping with surrounding 
houses. It is too suburban in character and would be much 
more conspicuous than the single storey stone building it 
would replace. The proposed use of recovered stone from 
the demolished building is tokenism and bears witness to 
the qualities of the stonework of the original building. 

• Previous decisions have protected the open view to the 
North and the amenity and setting of the traditional 
steading building. Its demolition an replacement could 
lead to further efforts to sub-divide the plot, 

• The existing steading should be repaired and extended 
rather than replaced, 

• The replacement of the characterful and rural steading 
building would be to the further detriment to the outlook 
from two major hotels in the village, at a time when 
business considerations are of great importance, 

• In present conditions there is no guarantee that the 
steading would be replaced once demolished, 

• Any replacement should be no higher than the existing 
steading, 

• The existing steading screens the new and uncharacteristic 
house that stands behind it, 

• The proposed landscaping appears to block the sight lines 
from the adjacent access road. 

22. Copies of all representations received are provided for the 
Committee’s consideration. 

APPRAISAL 

23. The main issues for consideration in this application are the legal 
basis for the decision, the condition and qualities of the existing 
building, the design and suitability of the proposed house in the 
context of the site and its surroundings and the impacts of the 
proposal on the wider character of the village. 


PAGE 11

Legal Considerations 

24. The policy advice in NPPG 18 deals with the statutory 
requirements surrounding the demolition of Listed Buildings or 
unlisted buildings in Conservation Areas. Balnagowan steading is 
neither Listed nor in a Conservation Area. Outside Conservation 
Areas demolition in itself is defined as permitted development. 
Demolition of a dwelling house is permitted subject to the prior 
approval of details of the method of demolition and the 
reinstatement of the site. When demolition is proposed as part of 
a redevelopment scheme then the details should be included in 
the proposals for the redevelopment of the site. The suitability 
and acceptability of the redevelopment proposal is therefore 
material to considering the reinstatement of the site following 
demolition. The Planning Authority is therefore entitled to 
consider the redevelopment in the context of its contribution to 
the character of the area when compared with the qualities and 
condition of the existing building to be removed. This is 
particularly material in the context of the statutory Aims of the 
National Park to conserve the natural and cultural heritage of 
the area and to promote a sustainable economic and social 
development of the area’s communities. The emphasis must 
therefore be on considering the merits of the new house 
proposed for the site, in the context of the qualities and 
condition of the building to be removed and not merely the 
merits or otherwise of the proposed demolition. 

The Existing Building 

25. The existing building is a dwelling house previously converted 
from a disused agricultural building. The building is in a very 
prominent position and makes a notable contribution to the 
character and amenity of Nethy Bridge, by virtue of its age, 
position and traditional appearance. It is a granite building 
partially faced in modern harl. It is solid, plain and sturdy, 
conveying a quality build and appearance. It therefore roots the 
origins of Nethy Bridge in a former agricultural age and is 
appreciated locally for its character and history. 

26. The previous conversion is simple on the exterior but the interior 
bears witness to substantial efforts made to stabilise and tank the 
building. There are large areas of block building inside and 
evidence of damp and failed tanking. Little of the original 
character remains. 


PAGE 12

27. A structural engineer’s report from HGA Consulting Engineers 
attests to the condition of the building. They recommend that 
the building is demolished and rebuilt. Their recommendation 
arises from the condition of the building below ground level. The 
visible building is thought to have been built on top of the loose 
rubble walls of an older former steading, set well into the 
embankment. The lower walls have failed completely and are 
incapable of safely supporting the upper steading despite the 
apparent soundness of the visible part of the building. To quote 
from their recommendations: “The masonry viewed in the lower 
section of the property is situated on material containing organic 
material. To stabilise and renovate this property the lower 
masonry below ground level would require to be rebuilt. Te 
formation stones elsewhere would require to be underpinned….A 
tanking system and damp proof membranes would be 
required….The rear (East) wall and South (East corner would be 
taken down to approximately 3 metres below the adjacent 
ground level. The remaining wall sections would require to be 
stabilised utilising specialist scaffolding or propping. They would 
also require to be underpinned….Due to the condition of the 
masonry we do not see how this could be carried out in a safe 
manner and retain the building. Any works carried out to the 
property would require to be undertaken to the relevant Health 
and Safety Guidelines and the CDM Regulations”. 

28. The agent has also submitted a letter from CDMM (UK) Ltd., 
consulting engineers responsible for co-ordinating the 
Construction (Design and Management) Regulations 2007, in 
Highland. Under the new regulations, all design parties are 
required to take responsibility for the health, safety and design 
characteristics of building projects. He concludes that 
underpinning the existing structure in a safe manner would be 
virtually impossible and he sees no feasible alternative to 
demolition. 

29. The applicant argues that the extent of the rebuilding work is not 
viable and if implemented, the already approved alterations 
and extensions would materially alter the appearance and 
character of the building therefore a rebuild as existing would 
not result in the retention of the building in its existing form. 

The Proposed House Design and Siting 

30. It is proposed to replace the building with a new house. The 
house is traditionally styled with Victorian features but adopts a 
modern scale, proportions and layout. From Balnagowan Brae 
the house is partially obscured by the undulating ground levels. 


PAGE 13

From Grantown Road the proposed house would appear no 
higher than the existing steading building or the adjacent new 
house and would stand out no more severely on the skyline. It 
would be partially screened by Poplar Trees. It is similar to many 
of the more recent houses in the area and has been modified to 
improve the traditional detailing and levels. It includes a facing 
of stone to reflect the its historic setting and evoke the former 
steading but it is recognised that this does not provide the same 
character as the original. Unlike the previous appeal proposal it is 
not, however, discordant with the very traditional former farm 
house at Balnagowan due to the spacing and change in levels 
between the two and the landscaping that is likely to grow up 
between the two buildings. 

31. It is the case that a rebuild and sensitive extension of the original 
steading structure would better uphold the National, National 
Park and local objectives to protect the interests of local 
distinctiveness and character but the new house proposed is 
positioned and designed such that it to would maintain a scale 
and form of development compatible with the village character, 
albeit without the historical depth enjoyed by the former 
steading. 

Impact on Immediate Surroundings 

32. The new house has been positioned 1 metre further East than the 
steading but respects the original footprint, thus avoiding a 
position further East that would have a greater impact on the 
open spaces to the North and South and would lead to a higher 
and more imposing profile, all as found by the Reporter when a 
previous application was dismissed at appeal. The proposal 
would be only 16 metres from the side wall of the garage of the 
house to the West but the levels would be equal and rooms 
would not be intervisible. The house would be only 0.75metres 
closer to the Poplar Trees to the North than the existing building. 
The ground concerned has already been disturbed in efforts to 
stabilise the building and the Poplars would not be affected. No 
trees in the TPO area would be affected. 

Bat Survey 

33. The HLM Ecologist has identified the possibility of bat roosts or 
maternity roosts in the building. A bat survey has been 
commissioned and will be reported verbally to the Committee. 
The timing of the demolition is key to ensuring that either winter or 
summer habitat is not disturbed. If evidence of bats is found then 
a licence to demolish from Scottish Government through SNH 


PAGE 14

would be required. A condition and Advice note are 
recommended. 

Conclusions 

34. It is acknowledged that the existing building has severe structural 
limitations which would prevent its partial rebuild and renovation 
and indicate the need to demolish it. It is recognised that a 
sympathetic rebuild would better uphold the historic references, 
character and authenticity of the original but such a proposal is 
not up for consideration and a view must be taken on the house 
before the committee. The proposed house is of a different 
character but has some merits in reflecting the Victorian 
traditions of the village, similar to many houses in the village. The 
site and the house have been designed and positioned to 
protect the amenity and character of the area, the amenities of 
neighbours and the setting of Balnagowan Farm. The relationship 
with Balnagowan Brae is restricted by the profile of the banks but 
the undulating nature of the locus and partial view of the house 
from the public road is not untypical of the area, not detrimental 
to the point that refusal is necessary and it is not considered to 
be in breach of local policies on layout and infill development. 
The application is therefore recommended fro approval subject 
to conditions and consideration of the potential for bat habitat 
at the site. 

IMPLICATIONS FOR THE AIMS OF THE NATIONAL PARK 

Conserve and Enhance the Natural and Cultural Heritage of the Area 

35. The replacement house would be neutral in terms of this aim 
whilst the demolition of the existing converted steading would be 
detrimental to maintaining the physical fabric of the village that 
bears witness to the cultural heritage and past of Nethy Bridge as 
an agricultural community. 

Promote Sustainable Use of Natural Resources 

36. Continued attempts to refurbish the conversion involve a futile 
use of resources. A new structure offers opportunities for energy 
saving and a reuse of stone recovered from the site. 

Promote Understanding and Enjoyment 

37. The replacement house would be neutral in terms of this aim. 


PAGE 15

Promote Sustainable Economic and Social Development 

38. The proposed building would not detract from the attractiveness 
of Nethybridge but could not provide the same depth of 
character projected by older buildings and found so attractive 
by visitors. The loss of the converted steading would remove a 
characterful building in a prominent position on a tourist route 
into the village. The demolition therefore detrimental to this aim 
but the proposed replacement is considered to be neutral in its 
effect. 

RECOMMENDATION 

That Members of the Committee agree to a recommendation to: 

GRANT planning permission subject to: 

i) Receipt of a satisfactory bat survey confirming that bats are 
not present in the building and that conditions are not 
suitable for a summer maternity roost:

 ii) The following conditions: 

1. The development to which this permission relates must be 
begun within five years from the date of this permission. 

2. In the event that there is no current evidence of bats or a 
bat roost then the demolition must be substantially 
completed before 1st May 2009. In the event that 
demolition takes place between 1st May and 30 
September 2009 then a further bat survey must be carried 
out by a suitably qualified bat surveyor and the results 
reported to the Cairngorms National Park Authority acting 
as Planning Authority before the demolition proceeds. The 
demolition may not proceed until the Authority confirms 
that a Licence from Scottish Government is not required. 
The same repeat surveys are required in the winter and 
summer seasons in any year during the life of the planning 
permission hereby granted. 

3. Prior to the commencement of the development hereby 
approved, a photographic record shall be made of the 
remains of the former steading at the site, in accordance 
with the details contained in the “Basic Photographic 
Record” notes published by Highland Council and dated 
11/03/07, and submitted to the Highland Council 


PAGE 16

Archaeological Service. No site clearance shall take place 
until confirmation in writing has been received from 
Highland Council that the record made has been lodged 
and is satisfactory. 

4. The dwelling house hereby approved shall be finished in 
the natural stone down takings recovered from the existing 
building or in natural stonework of a matching type colour 
and finish, as shown on the approved plans, to the 
satisfaction of the Cairngorms National Park Authority. 

5. The development shall be landscaped and maintained in 
accordance with a scheme which shall be submitted to 
and approved by the Planning Authority before 
development commences. The scheme shall indicate the 
siting, numbers, species and heights (at the time of 
planting) of all trees, shrubs and hedges to be planted. For 
the avoidance of doubt all trees shall be native to the 
Speyside area and shall ensure:- 

(a) Completion of the scheme during the planting 
season next following the completion of the 
development, or such other date as may be agreed 
in writing with the Planning Authority. 

(b) The maintenance of the landscaped areas in 
perpetuity in accordance with the detailed 
maintenance schedule/table. Any trees or shrubs 
removed, or which in the opinion of the Planning 
Authority, are dying, being severely damaged or 
becoming seriously diseased within three years of 
planting, shall be replaced by trees or shrubs of 
similar size and species to those originally required to 
be planted. 

6. That notwithstanding the provisions of the Town and 
Country Planning (General Permitted Development) 
(Scotland) Order 1992, no fences or walling shall be 
erected on the site without the prior written consent of the 
Cairngorms National Park Authority. 

7. Prior to any other part of the development commencing, 
the access road off the main access road from the public 
road at Balnagowan Brae shall be a minimum of 5.0 
metres wide for at least the first 6 metres measured from 
the nearside edge of the main access road. Construction 
over this length shall consist of 40mm thick Close graded 
wearing Course on 60mm thick Dense Base Course on 


PAGE 17

350mm thick Type 1 sub base, all on a sound formation. 
Thereafter the access shall be at least 3.0 metres wide and 
construction shall consist of 350mm thick Type 1 sub base 
on a sound formation. 

8. Prior to any other part of the development commencing 
visibility splays shall be provided and thereafter maintained 
on each side of the site access road at its junction with the 
main access road. These splays shall be the triangles of 
ground bounded by the first 2.5 metres along the centre 
line of the access road (the x dimension) and the nearside 
edge of the main access road (the y dimension) measured 
70 metres in each direction from the intersection of the 
access road with the main access road. Within the visibility 
splays nothing shall obscure visibility between the driver’s 
eye height of 1.0 metre positioned at the x dimension and 
the object height of 1.0 metre anywhere along the y 
dimension. 

9. Any gates that are provided shall open into the property 
only. 

10. Prior to the approved dwelling house coming into use, 
parking and manoeuvring space for at least 2 vehicles 
shall be provided with in the curtilage of the property such 
that all may enter and leave the site independently and in 
forward gear. 


ADVICE NOTE 

The applicant is advised that it is a criminal offence under the 
Wildlife and Countryside Act 1981 to disturb or destroy a bat roost 
without a licence from the Scottish Government. Attention to 
Condition 2 and the requirements of the legislation is essential 
before any works on the demolition of the building take place. 

It is similarly an offence to disturb birds nests and the building 
must be checked for any nesting birds before any demolition 
commences. If there is any evidence of nesting birds a licence is 
required from the Scottish Government. 

Hilary MacBean.... 
25th February 2009 

planning@cairngorms.co.uk 


PAGE 18

The map on the first page of this report has been produced to aid in the statutory process of dealing with 
planning applications. The map is to help identify the site and its surroundings and to aid Planning Officers, 
Committee Members and the Public in the determination of the proposal. Maps shown in the Planning 
Committee Report can only be used for the purposes of the Planning Committee. Any other use risks 
infringing Crown Copyright and may lead to prosecution or civil proceedings. Maps produced within this 
Planning Committee Report can only be reproduced with the express permission of the Cairngorms 

National Park Authority and other Copyright holders. This permission must be granted in advance.